We have a day off from the bathroom project. The pan needs to dry. It looks like there will be flurries of activity in between quiet times. The next tradesman to come is the plumber. I was under the impression that he was going to install the faucet assembly but I was corrected--he is going to install the "valve." It's always good to know (and use) the correct vocabulary.
The next step is installing the new greenboard. Because it is in the shower this type of "drywall" does not have to taped.
The beat goes on!
No comments:
Post a Comment